[dfads params='groups=4969&limit=1&orderby=random']

Construction proceeds on schedule

acf99eff66293ed7bce346469ec24c48.jpg

 

By Sun Advocate

People entering the College of Eastern Utah campus encounter torn up sidewalks between the student activity center and CEU’s main offices during construction of the Reeves building. Excavation had to take place in order to connect the Reeves structure into existing electrical and water lines as well as the central heating system coming from the west part of campus where the old physical plant building was located.

[dfads params='groups=1745&limit=1&orderby=random']
scroll to top